Midway BESS (ERCOT-23INR0688) — Project Summary

Queue ID
ERCOT-23INR0688
Capacity
9.95 MW
Technology
Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Midway BESS Station LLC
IA Status
IA Executed

Midway BESS

ERCOT-23INR0688BetaActiveBatteryERCOTLBNL

9.95 MW storage in Ector, TX · In queue since May 2023 · Proposed COD March 2025

9.95 MW

Capacity

1

Components

Battery

3 years

In Queue

IA Executed

IA Status

Signed Jun 2022

Interconnection

IA → COD

2y 9m

Total Duration

3 years

Schedule

14 months past proposed COD

Construction75%
Queue EntryMay 23, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 13, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2025-03-07

About

The Midway BESS project is a proposed 9.95 MW battery storage project located in Ector County, Texas. Developed by Midway BESS Station LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-23INR0688, with a queue entry date of May 23, 2023, and a proposed commercial operation date of March 7, 2025.

The project's Interconnection Agreement (IA) has been executed as of June 13, 2022. The Point of Interconnection (POI) is at the Midway station (Station Code: MIDWY) on the 138kV transmission level, specifically at Load/Load Transformer Name LDXFMR1, PTI Bus number 1253. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Midway BESS Station LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Station Code: MIDWY Station name: Midway Load/Load Transformer Name: LDXFMR1 PTI Bus number: 1253 Transmission level kV: 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Midway BESS