Invictus Energy Storage
140.53 MW storage in Coleman, TX · In queue since January 2024 · Proposed COD May 2028
140.53 MW
Capacity
1
Components
Battery
2y 4m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-31
The Invictus Energy Storage project is a proposed 140.53 MW battery energy storage system located in Coleman County, Texas. The project, developed by Indigo BESS LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0794, with a queue entry date of January 3, 2024.
The proposed commercial operation date for Invictus Energy Storage is May 31, 2028. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 6390 FIREROCK4A 138kV location. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Coleman
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Indigo BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
6390 FIREROCK4A 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.