Stoneridge Solar
201.6 MW generation in Milam, TX · In queue since October 2021 · Proposed COD April 2026
201.6 MW
Capacity
1
Components
Solar
4y 7m
In Queue
IA Executed
IA Status
Signed May 2023
Queue → IA
1y 7m
IA → COD
2y 11m
Total Duration
1y 7m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-04-01
Stoneridge Solar is a proposed 201.6 MW solar generation project located in Milam County, Texas. The project, developed by Stoneridge Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-24INR0031. It entered the queue on October 8, 2021, with a proposed commercial operation date of April 1, 2026. The project's Interconnection Agreement (IA) was executed on May 15, 2023.
The proposed project is linked to the existing operating plant named Stoneridge Solar, LLC (EIA plant ID 69027). Recent news coverage has highlighted the project, focusing on grid-related aspects.
Generated from interconnection queue and public data sources
State
TX
County
Milam
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Stoneridge Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP Beulah Switch to tap above line
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- STRG_SLR_ALL
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26