Yaupon Solar SLF (ERCOT-24INR0042) — Project Summary

Queue ID
ERCOT-24INR0042
Capacity
204.08 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Yaupon Solar, LLC
IA Status
IA Executed

Yaupon Solar SLF

ERCOT-24INR0042BetaActiveSolarERCOTLBNL + Live

204.08 MW generation in Milam, TX · In queue since March 2021 · Proposed COD July 2027

204.08 MW

Capacity

1

Components

Solar

5y 2m

In Queue

IA Executed

IA Status

Signed Sep 2023

Interconnection

Queue → IA

2y 6m

IA → COD

3y 10m

Total Duration

2y 6m

Construction75%
Queue EntryMar 30, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 28, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-07-01

About

Yaupon Solar SLF is a proposed 204.08 MW solar generation project located in Milam County, Texas. The project, developed by Yaupon Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0042, with a queue entry date of March 30, 2021. The proposed commercial operation date is July 1, 2027.

The project's Interconnection Agreement (IA) has been executed as of September 28, 2023. The point of interconnection is Tap 345 kV Gibson Switch (3706) _x0013_ TNP One (39950).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Yaupon Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345 kV Gibson Switch (3706) _x0013_ TNP One (39950)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Yaupon Solar SLF