Sypert Branch Solar Project
261.15 MW generation in Milam, TX · In queue since September 2021 · Proposed COD April 2026
261.15 MW
Capacity
1
Components
Solar
4y 8m
In Queue
IA Executed
IA Status
Signed Oct 2023
Queue → IA
2y 1m
IA → COD
2y 6m
Total Duration
2y 1m
Schedule
0 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-04-30
The Sypert Branch Solar Project is a proposed solar generation project located in Milam County, Texas, with a total capacity of 261.15 MW. Developed by Sypert Branch Solar LLC, the project consists entirely of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0070, with a queue entry date of September 21, 2021, and a proposed commercial operation date of April 30, 2026.
The project's interconnection agreement has been executed as of October 12, 2023. The point of interconnection is Tap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2. The Sypert Branch Solar Project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Milam
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Sypert Branch Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Sypert Branch Solar Project