Tres Margaritas Solar (ERCOT-24INR0088) — Project Summary

Queue ID
ERCOT-24INR0088
Capacity
60.95 MW
Technology
Solar
Status
active
Location
Dimmit, TX
Region
ERCOT
Developer
Gransolar Texas Six, LLC
IA Status
Facility Study

Tres Margaritas Solar

ERCOT-24INR0088BetaActiveSolarERCOTLBNL

60.95 MW generation in Dimmit, TX · In queue since July 2021 · Proposed COD June 2026

60.95 MW

Capacity

1

Components

Solar

4y 10m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryJul 13, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-30

About

The Tres Margaritas Solar project is a proposed 60.95 MW solar generation facility in Dimmit County, Texas. The project, developed by Gransolar Texas Six, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0088, with a queue entry date of July 13, 2021. Its proposed commercial operation date is June 30, 2026, and its interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for the project is the Tap 138kV 8613 Big Wells – Dilley Switching Station. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dimmit

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Six, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 8613 Big Wells _x0013_ 8212 Dilley Switching Station

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.