Dovetail Solar 1
666.1 MW generation in Jack, TX · In queue since September 2021 · Proposed COD April 2027
666.1 MW
Capacity
1
Components
Solar
4y 8m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-15
Dovetail Solar 1 is a proposed 666.1 MW solar generation project located in Jack County, Texas. The project, developed by Hecate Energy Dovetail Solar 1 LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0094, with a queue entry date of September 21, 2021.
The proposed commercial operation date for Dovetail Solar 1 is April 15, 2027. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2.
Generated from interconnection queue and public data sources
State
TX
County
Jack
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hecate Energy Dovetail Solar 1 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- WCPP_CC1
- POI Substation
- Willow Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.