Braswell Solar
42.6 MW generation in Mclennan, TX · In queue since August 2021 · Proposed COD March 2028
42.6 MW
Capacity
1
Components
Solar
4y 9m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
6y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-15
The Braswell Solar project is a proposed 42.6 MW solar generation facility in McLennan County, Texas. The project, developed by Gransolar Texas Nine, LLC, is interconnected within the ERCOT region under queue ID ERCOT-24INR0104. Its queue entry date is August 30, 2021, and the proposed commercial operation date is March 15, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Braswell Solar operating plant (EIA plant ID 67772).
Generated from interconnection queue and public data sources
State
TX
County
Mclennan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Gransolar Texas Nine, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 69kV 147 Lorena - 3580 Eddy Substation (Will be converted to 138kV line before 3/14/25 per TSP)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- POI Substation
- Lorena Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.