BRP Triton BESS
205.36 MW storage in Comanche, TX · In queue since October 2021 · Proposed COD December 2026
205.36 MW
Capacity
1
Components
Battery
4y 7m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-01
The BRP Triton BESS project is a proposed 205.36 MW battery storage project located in Comanche County, Texas. Developed by BRP Triton BESS LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0111, with a queue entry date of October 18, 2021.
The proposed commercial operation date for the BRP Triton BESS project is December 1, 2026. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the 138 kV Comanche Switch Substation (#1441). The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Comanche
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Triton BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV Comanche Switch Substation (#1441)
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Comanche
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about BRP Triton BESS