Possum Kingdom Solar (ERCOT-24INR0118) — Project Summary

Queue ID
ERCOT-24INR0118
Capacity
262.22 MW
Technology
Solar
Status
active
Location
Jack, TX
Region
ERCOT
Developer
PK Solar, LLC
IA Status
Facility Study

Possum Kingdom Solar

ERCOT-24INR0118BetaActiveSolarERCOTLBNL + Live

262.22 MW generation in Jack, TX · In queue since September 2021 · Proposed COD October 2027

262.22 MW

Capacity

1

Components

Solar

4y 8m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

6y 1m

Facilities Study50%
Queue EntrySep 13, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-29

About

Possum Kingdom Solar is a proposed solar generation project located in Jack County, Texas, with a total capacity of 262.22 MW. The project, being developed by PK Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0118, with a queue entry date of September 13, 2021. The proposed commercial operation date is October 29, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection (POI) for Possum Kingdom Solar is Tap 345kV 1421 Willow Creek Switch _x0013_ 11523 Thomas Price. The development has appeared in recent news coverage regarding renewable energy projects in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Jack

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

PK Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 1421 Willow Creek Switch _x0013_ 11523 Thomas Price

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Possum Kingdom Solar