BRP Artemis BESS (ERCOT-24INR0130) — Project Summary

Queue ID
ERCOT-24INR0130
Capacity
411.32 MW
Technology
Battery
Status
active
Location
Grimes, TX
Region
ERCOT
Developer
BRP Artemis BESS LLC
IA Status
Facility Study

BRP Artemis BESS

ERCOT-24INR0130BetaActiveBatteryERCOTLBNL + Live

411.32 MW storage in Grimes, TX · In queue since December 2021 · Proposed COD December 2028

411.32 MW

Capacity

1

Components

Battery

4y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

7 years

Facilities Study50%
Queue EntryDec 20, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

About

The BRP Artemis BESS project is a proposed 411.32 MW battery storage project located in Grimes County, Texas. Developed by BRP Artemis BESS LLC, the project is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-24INR0130 on December 20, 2021. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of December 1, 2028.

The project consists entirely of battery storage, with a total capacity of 411.32 MW. The point of interconnection is the 40600 Roans Prairie Substation 345kV. The project is currently listed as active in the ERCOT interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Grimes

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Artemis BESS LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

40600 Roans Prairie Substation 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.