BRP Hestia BESS (ERCOT-24INR0133) — Project Summary

Queue ID
ERCOT-24INR0133
Capacity
29.05 MW
Technology
Battery
Status
active
Location
Edwards, TX
Region
ERCOT
Developer
BRP Hestia BESS LLC
IA Status
Facility Study

BRP Hestia BESS

ERCOT-24INR0133BetaActiveBatteryERCOTLBNL

29.05 MW storage in Edwards, TX · In queue since December 2021 · Proposed COD December 2028

29.05 MW

Capacity

1

Components

Battery

4y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

7 years

Facilities Study50%
Queue EntryDec 29, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

About

The BRP Hestia BESS project is a proposed 29.05 MW battery storage project located in Edwards County, Texas. Developed by BRP Hestia BESS LLC, the project is currently in the ERCOT interconnection queue as entry ERCOT-24INR0133, with a queue entry date of December 29, 2021.

The project's proposed commercial operation date is December 1, 2028. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the 69 kV Rock Springs Substation (#78238, LCRA).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Edwards

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Hestia BESS LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

the 69 kV Rock Springs Substation (#78238, LCRA)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Rim Rock Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about BRP Hestia BESS