Eagle Springs Solar
110.1 MW generation in Delta, TX · In queue since October 2021 · Proposed COD December 2026
110.1 MW
Capacity
1
Components
Solar
4y 7m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
Eagle Springs Solar is a proposed 110.1 MW solar generation project located in Delta County, Texas. The project, developed by Eagle Springs Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0137, with a queue entry date of October 18, 2021. Its proposed commercial operation date is December 31, 2026, and its interconnection agreement status is currently in the Facility Study phase.
The proposed project is composed of 110.1 MW of solar capacity. The point of interconnection is the Tap Lake Creek Substation (#6835) _x0013_ Enloe Switching station (#6834) 138 kV Line. Recent news coverage indicates industry interest in the project.
Generated from interconnection queue and public data sources
State
TX
County
Delta
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Eagle Springs Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap Lake Creek Substation (#6835) _x0013_ Enloe Switching station (#6834) 138 kV Line
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- SCES_UNIT1
- POI Substation
- Lake Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Eagle Springs Solar