Eagle Springs Solar (ERCOT-24INR0137) — Project Summary

Queue ID
ERCOT-24INR0137
Capacity
110.1 MW
Technology
Solar
Status
active
Location
Delta, TX
Region
ERCOT
Developer
Eagle Springs Solar, LLC
IA Status
Facility Study

Eagle Springs Solar

ERCOT-24INR0137BetaActiveSolarERCOTLBNL + Live

110.1 MW generation in Delta, TX · In queue since October 2021 · Proposed COD December 2026

110.1 MW

Capacity

1

Components

Solar

4y 7m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryOct 18, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

About

Eagle Springs Solar is a proposed 110.1 MW solar generation project located in Delta County, Texas. The project, developed by Eagle Springs Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0137, with a queue entry date of October 18, 2021. Its proposed commercial operation date is December 31, 2026, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project is composed of 110.1 MW of solar capacity. The point of interconnection is the Tap Lake Creek Substation (#6835) _x0013_ Enloe Switching station (#6834) 138 kV Line. Recent news coverage indicates industry interest in the project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Delta

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Eagle Springs Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap Lake Creek Substation (#6835) _x0013_ Enloe Switching station (#6834) 138 kV Line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SCES_UNIT1
POI Substation
Lake Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Eagle Springs Solar