De Los Santos
200.97 MW storage in Maverick, TX · In queue since May 2022 · Proposed COD December 2027
200.97 MW
Capacity
1
Components
Battery
4 years
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
The De Los Santos project is a proposed 200.97 MW battery storage project located in Maverick County, Texas. The developer is BRP De Los Santos BESS LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0142, with a queue entry date of May 10, 2022.
The proposed commercial operation date for the De Los Santos project is December 1, 2027. Its interconnection point is the 78016 Sunglow Substation 138kV. The project's interconnection status is currently in the Facility Study phase.
Generated from interconnection queue and public data sources
State
TX
County
Maverick
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP De Los Santos BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
78016 Sunglow Substation 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.