Lupinus Storage 1
82.97 MW storage in Franklin, TX · In queue since December 2021 · Proposed COD September 2027
82.97 MW
Capacity
1
Components
Battery
4y 5m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-13
Lupinus Storage 1 is a proposed 82.97 MW battery storage project located in Franklin County, Texas. The project, developed by Lupinus Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0153, with a queue entry date of December 13, 2021.
The proposed commercial operation date for Lupinus Storage 1 is September 13, 2027. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES.
Generated from interconnection queue and public data sources
State
TX
County
Franklin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lupinus Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Lupinus Storage 1