Moonstone Solar Project
145.81 MW generation in Wilson, TX · In queue since October 2021 · Proposed COD March 2029
145.81 MW
Capacity
1
Components
Solar
4y 7m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
7y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-31
The Moonstone Solar Project is a proposed 145.81 MW solar generation project located in Wilson County, Texas. The developer is Ignis TX Solar One LLC. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0156, with a queue entry date of October 27, 2021, and a proposed commercial operation date of March 31, 2029.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV Eagle Creek (5132) to Floresville (5155). The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Wilson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Ignis TX Solar One LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV Eagle Creek (5132) to Floresville (5155)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Moonstone Solar Project