Miranda Solar Project (ERCOT-24INR0161) — Project Summary

Queue ID
ERCOT-24INR0161
Capacity
261.42 MW
Technology
Solar
Status
active
Location
Mcmullen, TX
Region
ERCOT
Developer
Miranda Solar Project, LLC
IA Status
IA Executed

Miranda Solar Project

ERCOT-24INR0161BetaActiveSolarERCOTLBNL + Live

261.42 MW generation in Mcmullen, TX · In queue since November 2021 · Proposed COD December 2027

261.42 MW

Capacity

1

Components

Solar

4y 6m

In Queue

IA Executed

IA Status

Signed Jul 2024

Interconnection

Queue → IA

2y 8m

IA → COD

3y 5m

Total Duration

2y 8m

Construction75%
Queue EntryNov 3, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 16, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-06

About

The Miranda Solar Project is a proposed solar generation project located in McMullen County, Texas, with a total capacity of 261.42 MW. Developed by Miranda Solar Project, LLC, the project is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-24INR0161 on November 3, 2021. The proposed commercial operation date is December 6, 2027, and the Interconnection Agreement was executed on July 16, 2024.

The project has an active status in the ERCOT queue and has been the subject of recent news coverage. The point of interconnection is at the Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Mcmullen

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Miranda Solar Project, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Fowlerton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Miranda Solar Project