261.42 MW generation in Mcmullen, TX · In queue since November 2021 · Proposed COD December 2027
261.42 MW
Capacity
1
Components
Solar
4y 6m
In Queue
IA Executed
IA Status
Signed Jul 2024
Queue → IA
2y 8m
IA → COD
3y 5m
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-12-06
The Miranda Solar Project is a proposed solar generation project located in McMullen County, Texas, with a total capacity of 261.42 MW. Developed by Miranda Solar Project, LLC, the project is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-24INR0161 on November 3, 2021. The proposed commercial operation date is December 6, 2027, and the Interconnection Agreement was executed on July 16, 2024.
The project has an active status in the ERCOT queue and has been the subject of recent news coverage. The point of interconnection is at the Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1.
Generated from interconnection queue and public data sources
State
TX
County
Mcmullen
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Miranda Solar Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Fowlerton Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Miranda Solar Project