Smith Lake Solar DC (ERCOT-24INR0172) — Project Summary

Queue ID
ERCOT-24INR0172
Capacity
402 MW
Technology
Solar
Status
active
Location
Grimes, TX
Region
ERCOT
Developer
Smith Lake Solar
IA Status
Facility Study

Smith Lake Solar DC

ERCOT-24INR0172BetaActiveSolarERCOTLBNL + Live

402 MW generation in Grimes, TX · In queue since February 2022 · Proposed COD December 2028

402 MW

Capacity

1

Components

Solar

4y 3m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

6y 10m

Facilities Study50%
Queue EntryFeb 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-29

About

Smith Lake Solar DC is a proposed 402 MW solar generation project located in Grimes County, Texas. The developer is Smith Lake Solar. It is an active project in the ERCOT interconnection queue (queue ID ERCOT-24INR0172), with an interconnection queue entry date of February 7, 2022, and a proposed commercial operation date of December 29, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 402 MW of solar capacity. The point of interconnection is the TAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99. The project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Grimes

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Smith Lake Solar

Utility

Entity

ERCOT

Service Type

Point of Interconnection

TAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LMO_ESR_RN
POI Substation
Singleton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.