Mitchell Plant Road Solar
201.5 MW generation in Pecos, TX · In queue since February 2022 · Proposed COD April 2026
201.5 MW
Capacity
1
Components
Solar
4y 3m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
4y 2m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-04-01
The Mitchell Plant Road Solar project is a proposed 201.5 MW solar generation facility in Pecos County, Texas. The project, being developed by DHI Power, LLC, is located within the Electric Reliability Council of Texas (ERCOT) region. It entered the ERCOT interconnection queue as entry 24INR0177 on February 21, 2022, with a proposed commercial operation date of April 1, 2026. The project's interconnection status is currently in the Facility Study phase.
The Mitchell Plant Road Solar project has been the subject of recent news coverage, with seven articles appearing in industry and regulatory publications.
Generated from interconnection queue and public data sources
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
DHI Power, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV 38430 White Baker TNP
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesNo ask pi reports yet for this entity.
ask pi about Mitchell Plant Road Solar