Frio Farm
106.5 MW generation in Frio, TX · In queue since December 2021 · Proposed COD June 2026
106.5 MW
Capacity
1
Components
Solar
4y 5m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
4y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-06-25
The Frio Farm project is a proposed 106.5 MW solar generation project located in Frio County, Texas. Developed by PREMIER ENGINEERING USA CORP., the project consists of 106.5 MW of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0180, with a queue entry date of December 20, 2021, and a proposed commercial operation date of June 25, 2026. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 8221 BIG FOOT4A 138kV substation.
The proposed project has appeared in recent news coverage regarding renewable energy development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Frio
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
PREMIER ENGINEERING USA CORP.
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8221 BIG FOOT4A 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Frio Farm