DeSpain Solar Project (ERCOT-24INR0182) — Project Summary

Queue ID
ERCOT-24INR0182
Capacity
236.17 MW
Technology
Solar
Status
active
Location
Kinney, TX
Region
ERCOT
Developer
Gransolar Texas Thirteen LLC
IA Status
Facility Study

DeSpain Solar Project

ERCOT-24INR0182BetaActiveSolarERCOTLBNL + Live

236.17 MW generation in Kinney, TX · In queue since December 2021 · Proposed COD December 2027

236.17 MW

Capacity

1

Components

Solar

4y 5m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntryDec 5, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-15

About

The DeSpain Solar Project is a proposed 236.17 MW solar generation project located in Kinney County, Texas. The developer is Gransolar Texas Thirteen LLC. This project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0182, with a queue entry date of December 5, 2021, and a proposed commercial operation date of December 15, 2027. Its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Despain Solar operating plant (EIA ID 66421). The DeSpain Solar Project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Kinney

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Thirteen LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

7425 Odlaw Switch 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
POI Substation
Odlaw Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.