Altamira Solar (ERCOT-24INR0183) — Project Summary

Queue ID
ERCOT-24INR0183
Capacity
150.66 MW
Technology
Solar
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
J&R Power DevCo, LLC
IA Status
Facility Study

Altamira Solar

ERCOT-24INR0183BetaActiveSolarERCOTLBNL

150.66 MW generation in Zapata, TX · In queue since January 2022 · Proposed COD March 2028

150.66 MW

Capacity

1

Components

Solar

4y 4m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

6y 2m

Facilities Study50%
Queue EntryJan 20, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

About

The Altamira Solar project is a proposed 150.66 MW solar generation facility in Zapata County, Texas. The project, developed by J&R Power DevCo, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0183, with a queue entry date of January 20, 2022. The proposed commercial operation date is March 1, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 8985 San Ygnacio 138 kV Substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

J&R Power DevCo, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

8985 San Ygnacio 138 kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
RELOJ_ALL
POI Substation
San Ygnacio Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.