Slate Solar Project (ERCOT-24INR0184) — Project Summary

Queue ID
ERCOT-24INR0184
Capacity
104.89 MW
Technology
Solar
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Ignis TX Solar Three LLC
IA Status
Facility Study

Slate Solar Project

ERCOT-24INR0184BetaActiveSolarERCOTLBNL + Live

104.89 MW generation in Zapata, TX · In queue since December 2021 · Proposed COD October 2027

104.89 MW

Capacity

1

Components

Solar

4y 5m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5y 10m

Facilities Study50%
Queue EntryDec 20, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-30

About

The Slate Solar Project is a proposed solar generation project located in Zapata County, Texas, within the ERCOT region. The project, developed by Ignis TX Solar Three LLC, has a total capacity of 104.89 MW. It entered the ERCOT interconnection queue as entry ERCOT-24INR0184 on December 20, 2021, and has a proposed commercial operation date of October 30, 2027. Its interconnection status is currently in the Facility Study phase.

The Slate Solar Project has been the subject of recent news coverage, including reports on deals and regulatory matters.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ignis TX Solar Three LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 8646 Rio Bravo - 8985 San Ygancio

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Rio Bravo Sub

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Slate Solar Project