Rowdy Creek Solar
351.78 MW generation in Lamar, TX · In queue since January 2022 · Proposed COD December 2027
351.78 MW
Capacity
1
Components
Solar
4y 4m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-29
Rowdy Creek Solar is a proposed solar generation project located in Lamar County, Texas, within the ERCOT region. The project, developed by Rowdy Creek Solar LLC, has a total capacity of 351.78 MW.
The project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0186, with a queue entry date of January 28, 2022. The proposed commercial operation date is December 29, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.
Generated from interconnection queue and public data sources
State
TX
County
Lamar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Rowdy Creek Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 1692 Paris Switch _x0013_ 1690 Valley SES
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.