White Tail Solar (ERCOT-24INR0200) — Project Summary

Queue ID
ERCOT-24INR0200
Capacity
226.8 MW
Technology
Solar
Status
active
Location
Deaf Smith, TX
Region
ERCOT
Developer
Mule Deer Solar LLC
IA Status
Facility Study

White Tail Solar

ERCOT-24INR0200BetaActiveSolarERCOTLBNL + Live

226.8 MW generation in Deaf Smith, TX · In queue since February 2022 · Proposed COD September 2027

226.8 MW

Capacity

1

Components

Solar

4y 3m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntryFeb 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-21

About

White Tail Solar is a proposed solar generation project with a total capacity of 226.8 MW, located in Deaf Smith County, Texas. The developer is Mule Deer Solar LLC. The project is in the ERCOT interconnection queue as entry ERCOT-24INR0200, with a queue entry date of February 7, 2022, and a proposed commercial operation date of September 21, 2027. Its interconnection status is currently in the Facility Study phase.

The White Tail Solar project has been the subject of recent news coverage, with four articles categorized as industry-related and regulatory.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Deaf Smith

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mule Deer Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV Windmill (23910) _x0013_ AJ Swope (23906)

Data Source

LBNL + Live

AgencyAugusta and York townships' planning commissionsMLive.com · 2024-08-13
RulingApprovalMLive.com · 2024-08-13
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about White Tail Solar