Wensowitch Solar (ERCOT-24INR0205) — Project Summary

Queue ID
ERCOT-24INR0205
Capacity
146.08 MW
Technology
Solar
Status
active
Location
Navarro, TX
Region
ERCOT
Developer
Greenalia Solar Power Wensowitch LLC
IA Status
Facility Study

Wensowitch Solar

ERCOT-24INR0205BetaActiveSolarERCOTLBNL + Live

146.08 MW generation in Navarro, TX · In queue since January 2022 · Proposed COD September 2028

146.08 MW

Capacity

1

Components

Solar

4y 4m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

6y 8m

Facilities Study50%
Queue EntryJan 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-08

About

The Wensowitch Solar project is a proposed 146.08 MW solar generation facility in Navarro County, Texas. The project, developed by Greenalia Solar Power Wensowitch LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0205, with a queue entry date of January 7, 2022, and a proposed commercial operation date of September 8, 2028. Its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Wensowitch Solar Park operating plant (EIA ID 67567). Recent news coverage has discussed the development project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Navarro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Greenalia Solar Power Wensowitch LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tapping 138 kV line Telico (192) to Montfort Switch (3454)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
HIGH
Nearest Node (Estimated)
TRSES_UNIT6

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Wensowitch Solar