Mitchell Plant Road Storage
201.6 MW storage in Pecos, TX · In queue since February 2022 · Proposed COD April 2026
201.6 MW
Capacity
1
Components
Battery
4y 3m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
4y 2m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-04-01
The Mitchell Plant Road Storage project is a proposed 201.6 MW battery storage project located in Pecos County, Texas. The developer is DHI POWER, LLC. This project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0255, with a queue entry date of February 28, 2022, and a proposed commercial operation date of April 1, 2026. Its interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 201.6 MW of battery storage capacity. The project has been mentioned in recent news coverage related to the electric grid.
Generated from interconnection queue and public data sources
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
DHI POWER, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV 38430 White Baker TNP
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Mitchell Plant Road Storage