Kennedy Solar
101.5 MW generation in Navarro, TX · In queue since March 2022 · Proposed COD December 2028
101.5 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
Kennedy Solar is a proposed 101.5 MW solar generation project located in Navarro County, Texas. The development project, sponsored by Kennedy Bypass Solar LLC, entered the ERCOT interconnection queue as ERCOT-24INR0256 on March 7, 2022. The proposed commercial operation date is December 31, 2028, and the project's interconnection status is currently in the Facility Study phase.
The Kennedy Solar project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Navarro
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Kennedy Bypass Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.