Jarvis BESS (ERCOT-24INR0265) — Project Summary

Queue ID
ERCOT-24INR0265
Capacity
308.4 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
SMT Ironman BESS LLC
IA Status
IA Executed

Jarvis BESS

ERCOT-24INR0265BetaActiveBatteryERCOTLBNL

308.4 MW storage in Brazoria, TX · In queue since March 2022 · Proposed COD January 2025

308.4 MW

Capacity

1

Components

Battery

4y 2m

In Queue

IA Executed

IA Status

Signed Dec 2022

Interconnection

Queue → IA

9 months

IA → COD

2y 1m

Total Duration

9 months

Schedule

15 months past proposed COD

Construction75%
Queue EntryMar 14, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 15, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2025-01-28

About

The Jarvis BESS project is a proposed 308.4 MW battery storage project located in Brazoria County, Texas. The developer is SMT Ironman BESS LLC. This project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0265, with a queue entry date of March 14, 2022.

The proposed commercial operation date for the Jarvis BESS project is January 28, 2025. An Interconnection Agreement (IA) has been executed for the project, with an IA date of December 15, 2022. The point of interconnection is the 43035 Oasis Substation 345kV.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

SMT Ironman BESS LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

43035 Oasis Substation 345kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Oasis Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.