Bar Candela Solar SLF
200.3 MW generation in Freestone, TX · In queue since March 2022 · Proposed COD December 2027
200.3 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
The Bar Candela Solar SLF is a proposed solar generation project located in Freestone County, Texas, with a total capacity of 200.3 MW. The project, developed by Bar Candela Solar Project LLC, is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-24INR0269 on March 21, 2022. Its proposed commercial operation date is December 31, 2027, and its interconnection status is currently in the Facility Study phase.
The proposed project consists solely of solar generation, with the entire 200.3 MW capacity attributed to solar photovoltaic technology. The point of interconnection is the Long Lake Sub (Bus 3280) and Long Lake Tap Switch (Bus 3279). The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Freestone
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bar Candela Solar Project LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Long Lake Sub (Bus 3280) _x0013_ Long Lake Tap Switch (Bus 3279)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Bar Candela Solar SLF