Sunshine Solar (ERCOT-24INR0283) — Project Summary

Queue ID
ERCOT-24INR0283
Capacity
130.72 MW
Technology
Solar
Status
active
Location
Victoria, TX
Region
ERCOT
Developer
Sunshine Energy LLC
IA Status
Facility Study

Sunshine Solar

ERCOT-24INR0283BetaActiveSolarERCOTLBNL

130.72 MW generation in Victoria, TX · In queue since September 2022 · Proposed COD December 2026

130.72 MW

Capacity

1

Components

Solar

3y 8m

In Queue

Facility Study

IA Status

COD target: 2026

Status
as of 20 months ago
Latest activitytechnology_launchSolar Energy Industries Association · 2024-09-06
Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-01

About

Sunshine Solar is a proposed 130.72 MW solar generation project located in Victoria County, Texas. The project, developed by Sunshine Energy LLC, is in the ERCOT interconnection queue as entry ERCOT-24INR0283, with a queue entry date of September 2, 2022. The proposed commercial operation date is December 1, 2026. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 130.72 MW of solar photovoltaic generation. It is planned to interconnect at a tap on the 138kV Lolita (#8125) - Victoria (#8172) Line. The project has been mentioned in recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Victoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sunshine Energy LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap on the 138kV Lolita (#8125) - Victoria (#8172) Line

Data Source

LBNL

CompanyStarbucksStarbucks · 2018-09-13
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (2)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about Sunshine Solar