Rockridge Solar Project (ERCOT-24INR0287) — Project Summary

Queue ID
ERCOT-24INR0287
Capacity
221.27 MW
Technology
Solar
Status
active
Location
Guadalupe, TX
Region
ERCOT
Developer
Magnolia Solar Development LLC
IA Status
Facility Study

Rockridge Solar Project

ERCOT-24INR0287BetaActiveSolarERCOTLBNL + Live

221.27 MW generation in Guadalupe, TX · In queue since April 2022 · Proposed COD April 2027

221.27 MW

Capacity

1

Components

Solar

4y 1m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5 years

Facilities Study50%
Queue EntryApr 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-03

About

The Rockridge Solar Project is a proposed solar generation project located in Guadalupe County, Texas. Developed by Magnolia Solar Development LLC, the project has a total capacity of 221.27 MW. It consists entirely of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0287, with a queue entry date of April 18, 2022, and a proposed commercial operation date of April 3, 2027. Its interconnection status is currently in the Facility Study phase. The Rockridge Solar Project has been mentioned in recent news coverage related to industry and deals.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Guadalupe

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Magnolia Solar Development LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

7225 Hickory Forest 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Hickory Forest Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Rockridge Solar Project