TRAVIS KIMBRO BESS (ERCOT-24INR0330) — Project Summary

Queue ID
ERCOT-24INR0330
Capacity
36.84 MW
Technology
Battery
Status
active
Location
Travis, TX
Region
ERCOT
Developer
Travis Kimbro BESS LLC
IA Status
IA Executed

TRAVIS KIMBRO BESS

ERCOT-24INR0330BetaActiveBatteryERCOTLBNL

36.84 MW storage in Travis, TX · In queue since September 2022 · Proposed COD September 2028

36.84 MW

Capacity

1

Components

Battery

3y 8m

In Queue

IA Executed

IA Status

Signed Oct 2024

Interconnection

Queue → IA

2y 1m

IA → COD

3y 11m

Total Duration

2y 1m

Construction75%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 31, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-09-18

About

The Travis Kimbro BESS project is a proposed 36.84 MW battery storage project located in Travis County, Texas. The developer is Travis Kimbro BESS LLC. It is interconnected within the ERCOT queue as entry ERCOT-24INR0330, with a queue entry date of September 2, 2022, and a proposed commercial operation date of September 18, 2028.

The project's interconnection agreement has been executed as of October 31, 2024. The point of interconnection is the 7337 Kimbro 138kV substation.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Travis

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Travis Kimbro BESS LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

7337 Kimbro 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.