Mystic Springs Renewable Energy Solar SLF (ERCOT-24INR0339) — Project Summary

Queue ID
ERCOT-24INR0339
Capacity
258.83 MW
Technology
Solar
Status
active
Location
Kaufman, TX
Region
ERCOT
Developer
Tawakoni Park Solar LLC
IA Status
Facility Study

Mystic Springs Renewable Energy Solar SLF

ERCOT-24INR0339BetaActiveSolarERCOTLBNL + Live

258.83 MW generation in Kaufman, TX · In queue since May 2022 · Proposed COD March 2028

258.83 MW

Capacity

1

Components

Solar

4 years

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 10m

Facilities Study50%
Queue EntryMay 10, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-31

About

Mystic Springs Renewable Energy Solar SLF is a proposed solar generation project located in Kaufman County, Texas, with a total capacity of 258.83 MW. The developer is Tawakoni Park Solar LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0339, with a queue entry date of May 10, 2022. The proposed commercial operation date is March 31, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is Tap 345 kV Royse Switch (2478) _x0013_ Poetry Switch (2485).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Kaufman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tawakoni Park Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345 kV Royse Switch (2478) _x0013_ Poetry Switch (2485)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Mystic Springs Renewable Energy Solar SLF