Mystic Springs Renewable Energy Solar SLF
258.83 MW generation in Kaufman, TX · In queue since May 2022 · Proposed COD March 2028
258.83 MW
Capacity
1
Components
Solar
4 years
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-31
Mystic Springs Renewable Energy Solar SLF is a proposed solar generation project located in Kaufman County, Texas, with a total capacity of 258.83 MW. The developer is Tawakoni Park Solar LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0339, with a queue entry date of May 10, 2022. The proposed commercial operation date is March 31, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection is Tap 345 kV Royse Switch (2478) _x0013_ Poetry Switch (2485).
Generated from interconnection queue and public data sources
State
TX
County
Kaufman
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Tawakoni Park Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV Royse Switch (2478) _x0013_ Poetry Switch (2485)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.