Blanket Ranch North Solar SLF
230.5 MW generation in Brown, TX · In queue since June 2022 · Proposed COD September 2028
230.5 MW
Capacity
1
Components
Solar
3y 11m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-22
Blanket Ranch North Solar SLF is a proposed solar generation project located in Brown County, Texas, within the ERCOT region. The project, developed by Blanket Ranch North Solar, LLC, has a total capacity of 230.5 MW. It consists of a single solar component with a capacity of 230.5 MW.
The project is currently active in the ERCOT interconnection queue under queue ID ERCOT-24INR0360, with an entry date of June 10, 2022. The proposed commercial operation date is September 22, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 11441 CORN TRAIL SWITCH - 1444 BROWN SWITCH.
Generated from interconnection queue and public data sources
State
TX
County
Brown
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Blanket Ranch North Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 11441 CORN TRAIL SWITCH - 1444 BROWN SWITCH
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.