Blanket Ranch South Storage SLF
33.8 MW storage in Brown, TX · In queue since June 2022 · Proposed COD September 2028
33.8 MW
Capacity
1
Components
Battery
3y 11m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-22
Blanket Ranch South Storage SLF is a proposed 33.8 MW battery storage project located in Brown County, Texas. The project, developed by Blanket Ranch South Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0361, with a queue entry date of June 10, 2022. The proposed commercial operation date is September 22, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 11441 CORN TRAIL SWITCH - 1444 BROWN SWITCH.
Generated from interconnection queue and public data sources
State
TX
County
Brown
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Blanket Ranch South Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 11441 CORN TRAIL SWITCH - 1444 BROWN SWITCH
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW