Farrier Station Energy Storage (ERCOT-24INR0374) — Project Summary

Queue ID
ERCOT-24INR0374
Capacity
409.9 MW
Technology
Battery
Status
active
Location
Hopkins, TX
Region
ERCOT
Developer
Farrier Station Energy Storage Project, LLC
IA Status
Facility Study

Farrier Station Energy Storage

ERCOT-24INR0374BetaActiveBatteryERCOTLBNL

409.9 MW storage in Hopkins, TX · In queue since January 2023 · Proposed COD June 2028

409.9 MW

Capacity

1

Components

Battery

3y 4m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 5m

Facilities Study50%
Queue EntryJan 17, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

About

Farrier Station Energy Storage is a proposed 409.9 MW battery storage project located in Hopkins County, Texas. The project, developed by Farrier Station Energy Storage Project, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0374, with a queue entry date of January 17, 2023. The proposed commercial operation date is June 1, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists entirely of battery storage with a total capacity of 409.9 MW. The point of interconnection is at the Monticello SES (BUS# 1696) - Allen Switch (BUS# 2514). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hopkins

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Farrier Station Energy Storage Project, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

MONTICELLO SES (BUS# 1696) - ALLEN SWITCH (BUS# 2514)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.