Portside Energy Center (Solar) SLF (ERCOT-24INR0401) — Project Summary

Queue ID
ERCOT-24INR0401
Capacity
41.11 MW
Technology
Solar
Status
active
Location
Victoria, TX
Region
ERCOT
Developer
Portside Energy Center, LLC
IA Status
IA Executed

Portside Energy Center (Solar) SLF

ERCOT-24INR0401BetaActiveSolarERCOTLBNL

41.11 MW generation in Victoria, TX · In queue since November 2022 · Proposed COD December 2026

41.11 MW

Capacity

1

Components

Solar

3y 6m

In Queue

IA Executed

IA Status

Signed Apr 2024

Interconnection

Queue → IA

1y 5m

IA → COD

2y 8m

Total Duration

1y 5m

Construction75%
Queue EntryNov 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 5, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-12-31

About

The Portside Energy Center (Solar) SLF is a proposed solar generation project located in Victoria County, Texas, with a total capacity of 41.11 MW. The project, developed by Portside Energy Center, LLC, is interconnected within the ERCOT region and entered the ERCOT interconnection queue as ERCOT-24INR0401 on November 15, 2022. The proposed commercial operation date is December 31, 2026.

The project has an Interconnection Agreement (IA) executed on April 5, 2024. The point of interconnection (POI) is the 80064 Chocolate Bayou 138kV. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Victoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Portside Energy Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

80064 Chocolate Bayou 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Chocolate Bayou Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Portside Energy Center (Solar) SLF