NRG Greens Bayou 6
445 MW generation in Harris, TX · In queue since August 2022 · Proposed COD May 2028
445 MW
Capacity
1
Components
Gas
3y 9m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-01
The NRG Greens Bayou 6 project is a proposed 445 MW gas-fired generation project located in Harris County, Texas. The developer is NRG Texas Power. It is interconnected within the ERCOT region under queue ID ERCOT-24INR0410, with an interconnection queue entry date of August 16, 2022. The proposed commercial operation date is May 1, 2028, and the interconnection agreement status is currently in the Facility Study phase.
The project is linked to the existing Greens Bayou operating plant (EIA plant ID 3464). Recent news coverage of the project includes topics such as deals, hazards, industry, and grid issues.
Generated from interconnection queue and public data sources
State
TX
County
Harris
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NRG Texas Power
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GBY_GT
- POI Substation
- Greens Bayou 69kV Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26