Greens Bayou Unit 9 CT 345
455 MW generation in Harris, TX · In queue since September 2022 · Proposed COD June 2026
455 MW
Capacity
1
Components
Gas
3y 8m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-06-02
The proposed Greens Bayou Unit 9 CT 345 project is a 455 MW gas-fired generation project located in Harris County, Texas. Developed by NRG Texas Power LLC, the project entered the ERCOT interconnection queue on September 21, 2022, with queue ID ERCOT-24INR0411. The proposed commercial operation date is June 2, 2026.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Greens Bayou Substation.
Generated from interconnection queue and public data sources
State
TX
County
Harris
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NRG Texas Power LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Position 1/0 PSSE 40700, Greens Bayou Substation
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.