Furay Battery Energy Storage System (ERCOT-24INR0413) — Project Summary

Queue ID
ERCOT-24INR0413
Capacity
304 MW
Technology
Battery
Status
active
Location
Harris, TX
Region
ERCOT
Developer
Blue Topaz 1, LLC
IA Status
Facility Study

Furay Battery Energy Storage System

ERCOT-24INR0413BetaActiveBatteryERCOTLBNL + Live

304 MW storage in Harris, TX · In queue since September 2022 · Proposed COD September 2028

304 MW

Capacity

1

Components

Battery

3y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-30

About

The Furay Battery Energy Storage System is a proposed 304 MW battery storage project in Harris County, Texas. Developed by Blue Topaz 1, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0413, with a queue entry date of September 2, 2022. The proposed commercial operation date is September 30, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is Tap 138kV 45660 Jonte substation _x0013_ 46332 Scenic Woods, tapping both radial lines. Recent news coverage has discussed the development project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blue Topaz 1, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 45660 Jonte substation _x0013_ 46332 Scenic Woods Tapping both radial lines.

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Scenic Woods Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.