Sierra Diablo Energy Storage (ERCOT-24INR0417) — Project Summary

Queue ID
ERCOT-24INR0417
Capacity
203.81 MW
Technology
Battery
Status
active
Location
Van Zandt, TX
Region
ERCOT
Developer
SIERRA DIABLO ENERGY STORAGE LLC
IA Status
Facility Study

Sierra Diablo Energy Storage

ERCOT-24INR0417BetaActiveBatteryERCOTLBNL + Live

203.81 MW storage in Van Zandt, TX · In queue since August 2022 · Proposed COD April 2026

203.81 MW

Capacity

1

Components

Battery

3y 9m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

3y 8m

Schedule

0 months past proposed COD

Facilities Study50%
Queue EntryAug 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-04-20

About

Sierra Diablo Energy Storage is a proposed 203.81 MW battery storage project located in Van Zandt County, Texas. The developer is Sierra Diablo Energy Storage LLC. This project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0417, with a queue entry date of August 5, 2022, and a proposed commercial operation date of April 20, 2026. Its interconnection status is currently in the Facility Study phase.

The proposed project consists of 203.81 MW of battery storage capacity. Sierra Diablo Energy Storage has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Van Zandt

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

SIERRA DIABLO ENERGY STORAGE LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kv 1698 Sulphur Springs Switch _x0013_ 3174 Canton Switch

Data Source

LBNL + Live

DeveloperFluenceEnergy-Storage.News · 2023-12-20
Deal value$238.0MEnergy-Storage.News · 2023-12-20
OfftakerDiablo Energy Storage LLCEnergy-Storage.News · 2023-12-20
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26