Swift Air Solar (ERCOT-24INR0421) — Project Summary

Queue ID
ERCOT-24INR0421
Capacity
146.5 MW
Technology
Solar
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Swift Air Solar, LLC
IA Status
IA Executed

Swift Air Solar

ERCOT-24INR0421BetaActiveSolarERCOTLBNL

146.5 MW generation in Ector, TX · In queue since November 2022 · Proposed COD March 2025

146.5 MW

Capacity

1

Components

Solar

3y 6m

In Queue

IA Executed

IA Status

Signed Apr 2024

Status
Latest milestoneCOD achieved · 2025-Q4Inspenet · 2026-03-02
Expected COD2025-12-31Inspenet · 2026-03-02
Interconnection

Queue → IA

1y 5m

IA → COD

11 months

Total Duration

1y 5m

Schedule

14 months past proposed COD

Construction75%
Queue EntryNov 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 30, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-03-19

About

Swift Air Solar is a proposed solar generation project located in Ector County, Texas, with a total capacity of 146.5 MW. The project, developed by Swift Air Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-24INR0421. It entered the interconnection queue on November 7, 2022, and has a proposed commercial operation date of March 19, 2025. The project's Interconnection Agreement (IA) was executed on April 30, 2024.

The proposed project is linked to the existing Swift Air Solar I operating plant (EIA plant ID 68537). Recent news coverage indicates activity related to the project, with 10 articles categorized as either deals or development.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Swift Air Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 1019 Moss Switch _x0013_ 11128 Shin Oak POD

Data Source

LBNL

DeveloperOrigis EnergyInspenet · 2026-03-02
TransactionProject financingMercomindia.com · 2025-12-17
Deal value$290.0M±Mercomindia.com · 2025-12-17
OfftakerOccidental Power±PV Tech · 2025-12-12
LenderNatixis Corporate & Investment Banking and Santander Corporate & Investment Banking±Mercomindia.com · 2025-12-17
PPA structurePhysicalPV Tech · 2025-12-12
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
Nearest Node (Estimated)
SWFT_SLR_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (8)Beta

Last updated 2026-03-26

View all 8 articles

No ask pi reports yet for this entity.

ask pi about Swift Air Solar