Swift Air Solar
146.5 MW generation in Ector, TX · In queue since November 2022 · Proposed COD March 2025
146.5 MW
Capacity
1
Components
Solar
3y 6m
In Queue
IA Executed
IA Status
Signed Apr 2024
Queue → IA
1y 5m
IA → COD
11 months
Total Duration
1y 5m
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2025-03-19
Swift Air Solar is a proposed solar generation project located in Ector County, Texas, with a total capacity of 146.5 MW. The project, developed by Swift Air Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-24INR0421. It entered the interconnection queue on November 7, 2022, and has a proposed commercial operation date of March 19, 2025. The project's Interconnection Agreement (IA) was executed on April 30, 2024.
The proposed project is linked to the existing Swift Air Solar I operating plant (EIA plant ID 68537). Recent news coverage indicates activity related to the project, with 10 articles categorized as either deals or development.
Generated from interconnection queue and public data sources
State
TX
County
Ector
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Swift Air Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 1019 Moss Switch _x0013_ 11128 Shin Oak POD
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SWFT_SLR_RN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26