CPS AvR CT1 Rotor Replacement
11.3 MW generation in Bexar, TX · In queue since October 2022 · Proposed COD March 2026
11.3 MW
Capacity
1
Components
Gas
3y 7m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
3y 5m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-03-28
The CPS AvR CT1 Rotor Replacement is a proposed 11.3 MW gas-fired generation project located in Bexar County, Texas. Developed by CPS Energy, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0427, with a queue entry date of October 24, 2022. The proposed commercial operation date is March 28, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.
The project involves a gas-fired generator with a capacity of 11.3 MW. The point of interconnection is the 5475 Braunig 345kV substation.
Generated from interconnection queue and public data sources
State
TX
County
Bexar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CPS Energy
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5475 Braunig 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BRA_AVR1_CT2
- POI Substation
- Braunig Switchyard
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about CPS AvR CT1 Rotor Replacement