Longfellow Solar I (ERCOT-24INR0452) — Project Summary

Queue ID
ERCOT-24INR0452
Capacity
178.2 MW
Technology
Solar
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
CENTURY GAS PROCESSING, LLC
IA Status
Facility Study

Longfellow Solar I

ERCOT-24INR0452BetaActiveSolarERCOTLBNL + Live

178.2 MW generation in Pecos, TX · In queue since November 2022 · Proposed COD June 2027

178.2 MW

Capacity

1

Components

Solar

3y 6m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 7m

Facilities Study50%
Queue EntryNov 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-30

About

Longfellow Solar I is a proposed 178.2 MW solar generation project located in Pecos County, Texas. The project, developed by CENTURY GAS PROCESSING, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0452, with a queue entry date of November 7, 2022. Its proposed commercial operation date is June 30, 2027, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 178.2 MW of solar photovoltaic generation. It is planned to connect to the 38431 TNCENTRY1_1 138 KV point of interconnection. The Longfellow Solar I project has appeared in recent news coverage regarding energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CENTURY GAS PROCESSING, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

38431 TNCENTRY1_1 138 KV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Longfellow Solar I