Barrett Solar
125.81 MW generation in Rains, TX · In queue since February 2023 · Proposed COD March 2026
125.81 MW
Capacity
1
Components
Solar
3y 3m
In Queue
IA Executed
IA Status
Signed Oct 2023
Queue → IA
8 months
IA → COD
2y 5m
Total Duration
8 months
Schedule
2 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-03-16
Barrett Solar is a proposed solar generation project located in Rains County, Texas, with a total capacity of 125.81 MW. The project, developed by Barrett Solar Project, LLC, consists entirely of solar photovoltaic technology.
The project is listed in the ERCOT interconnection queue as ERCOT-24INR0477, having entered the queue on February 27, 2023. Its proposed commercial operation date is March 16, 2026. An Interconnection Agreement (IA) has been executed for the project, with the IA effective as of October 5, 2023. The Point of Interconnection (POI) is the Tap 6798 SNYPT_RC - 6797 LNOK_RC 138kV line.
Generated from interconnection queue and public data sources
State
TX
County
Rains
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Barrett Solar Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 6798 SNYPT_RC - 6797 LNOK_RC 138kV line
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.