Barrett Solar (ERCOT-24INR0477) — Project Summary

Queue ID
ERCOT-24INR0477
Capacity
125.81 MW
Technology
Solar
Status
active
Location
Rains, TX
Region
ERCOT
Developer
Barrett Solar Project, LLC
IA Status
IA Executed

Barrett Solar

ERCOT-24INR0477BetaActiveSolarERCOTLBNL + Live

125.81 MW generation in Rains, TX · In queue since February 2023 · Proposed COD March 2026

125.81 MW

Capacity

1

Components

Solar

3y 3m

In Queue

IA Executed

IA Status

Signed Oct 2023

Interconnection

Queue → IA

8 months

IA → COD

2y 5m

Total Duration

8 months

Schedule

2 months past proposed COD

Construction75%
Queue EntryFeb 27, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 5, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-03-16

About

Barrett Solar is a proposed solar generation project located in Rains County, Texas, with a total capacity of 125.81 MW. The project, developed by Barrett Solar Project, LLC, consists entirely of solar photovoltaic technology.

The project is listed in the ERCOT interconnection queue as ERCOT-24INR0477, having entered the queue on February 27, 2023. Its proposed commercial operation date is March 16, 2026. An Interconnection Agreement (IA) has been executed for the project, with the IA effective as of October 5, 2023. The Point of Interconnection (POI) is the Tap 6798 SNYPT_RC - 6797 LNOK_RC 138kV line.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Rains

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Barrett Solar Project, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 6798 SNYPT_RC - 6797 LNOK_RC 138kV line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Barrett Solar