Lupinus Solar 3 (ERCOT-24INR0484) — Project Summary

Queue ID
ERCOT-24INR0484
Capacity
100.8 MW
Technology
Solar
Status
active
Location
Franklin, TX
Region
ERCOT
Developer
Lupinus Solar 2, LLC
IA Status
Facility Study

Lupinus Solar 3

ERCOT-24INR0484BetaActiveSolarERCOTLBNL

100.8 MW generation in Franklin, TX · In queue since September 2023 · Proposed COD September 2026

100.8 MW

Capacity

1

Components

Solar

2y 8m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

3 years

Facilities Study50%
Queue EntrySep 23, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-09-21

About

Lupinus Solar 3 is a proposed solar generation project located in Franklin County, Texas, within the ERCOT region. The development project, with a total capacity of 100.8 MW, is being developed by Lupinus Solar 2, LLC. It consists of 100.8 MW of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0484, with a queue entry date of September 23, 2023. The proposed commercial operation date is September 21, 2026, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the 1794 Monticello Tap 138 kV. The project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Franklin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lupinus Solar 2, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1794 Monticello Tap 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Monticello substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.