FLIFER Solar I
84 MW generation in Ward, TX · In queue since March 2023 · Proposed COD April 2027
84 MW
Capacity
1
Components
Solar
3y 2m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-15
The proposed FLIFER Solar I project is an 84 MW solar generation facility in Ward County, Texas. Developed by FLIFER LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0538, with a queue entry date of March 8, 2023. The proposed commercial operation date is April 15, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138 kV Yucca Drive Switch (bus# 1009) _x0013_ Sand Tank (bus# 11197). The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
TX
County
Ward
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
FLIFER LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV Yucca Drive Switch (bus# 1009) _x0013_ Sand Tank (bus# 11197)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about FLIFER Solar I