Angleton BESS (ERCOT-24INR0547) — Project Summary

Queue ID
ERCOT-24INR0547
Capacity
9.9 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Brazoria Winmill BESS, LLC
IA Status
IA Executed

Angleton BESS

ERCOT-24INR0547BetaActiveBatteryERCOTLBNL

9.9 MW storage in Brazoria, TX · Proposed COD February 2025

9.9 MW

Capacity

1

Components

Battery

In Queue

IA Executed

IA Status

Signed Oct 2023

Interconnection

IA → COD

1y 4m

Schedule

15 months past proposed COD

Construction75%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 31, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2025-02-13

About

Angleton BESS is a proposed 9.9 MW battery storage project located in Brazoria County, Texas. The project, developed by Brazoria Winmill BESS, LLC, is interconnected within the ERCOT region under queue ID ERCOT-24INR0547. It has an interconnection agreement (IA) executed on October 31, 2023, and a proposed commercial operation date of February 13, 2025.

The project is linked to the existing Angleton operating plant (EIA plant ID 64295).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Brazoria Winmill BESS, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

STATION NAME (TSP STATION CODE): Angleton (AE) LOAD/LOAD TRANSFORMER NAME: TR1 PTI BUS NUMBER: 42111 VOLTAGE (TRANSMISSION LEVEL): 138KV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
HIGH
Nearest Node (Estimated)
BRPANGLE_RN
POI Substation
Angleton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Angleton BESS