Nerva Energy Storage
101.2 MW storage in Brazoria, TX · In queue since April 2023 · Proposed COD June 2026
101.2 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-06-15
Nerva Energy Storage is a proposed 101.2 MW battery storage project located in Brazoria County, Texas. The project, developed by Nerva Energy Storage, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0559, with a queue entry date of April 19, 2023.
The proposed commercial operation date for the Nerva Energy Storage project is June 15, 2026. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 402410 BURKE_POI_8 - 42430 EGLNST_POI_8 CKT#02.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Nerva Energy Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 402410 BURKE_POI_8 - 42430 EGLNST_POI_8 CKT#02
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Nerva Energy Storage