Nerva Energy Storage (ERCOT-24INR0559) — Project Summary

Queue ID
ERCOT-24INR0559
Capacity
101.2 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Nerva Energy Storage, LLC
IA Status
Facility Study

Nerva Energy Storage

ERCOT-24INR0559BetaActiveBatteryERCOTLBNL

101.2 MW storage in Brazoria, TX · In queue since April 2023 · Proposed COD June 2026

101.2 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

3y 2m

Facilities Study50%
Queue EntryApr 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-15

About

Nerva Energy Storage is a proposed 101.2 MW battery storage project located in Brazoria County, Texas. The project, developed by Nerva Energy Storage, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0559, with a queue entry date of April 19, 2023.

The proposed commercial operation date for the Nerva Energy Storage project is June 15, 2026. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 402410 BURKE_POI_8 - 42430 EGLNST_POI_8 CKT#02.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Nerva Energy Storage, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 402410 BURKE_POI_8 - 42430 EGLNST_POI_8 CKT#02

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Nerva Energy Storage